Customer FAQs | Internet FAQs | Emergency Service | Installations | In-Home Wiring | Signal Leakage | PPV
VCR INSTALLATION WITH CONVERTERS
Required for homes with T.H.E. Box or Digital Terminal
With this wiring configuration:
*You can record any channel including scrambled channels.
*You cannot record one channel while watching another.
*Your timer function will be limited. You will be able to record while you
are away, but you must first set the converter to the channel you wish to
record.
TO RECORD:
1. Set the VCR's tuner to Channel 4. The converter will
provide the program you wish to record. Setting the VCR to record a channel
other than 4 will result in a snowy picture.
2. Set the converter to the channel you wish to
record. Changing channels on the converter while recording will result
in a recording that includes the channel changes.
3. Press the "RECORD" button. While recording, the
TV and converter do not need to be turned on.
TO PLAYBACK:
1. Turn the VCR and TV on.
2. Set the TV to the VCR playback channel (3 or 4).
3. Press the "PLAY" button. Be sure the "TV/VCR" button
is set to VCR. This usually happens when "PLAY" is pressed. The converter
does not need to be on while playing a tape.
INSTALLATIONS
Massillon Cable TV has a variety of installation appointment options including morning, afternoon, and Saturday availability. We will also schedule specific times and call ahead upon request. We strive to complete all standard installations (up to 125 feet from existing plant) within 7 working days, unless you request otherwise. Our installers work overtime to complete all installations on the date scheduled. If our installer is running late, we will call you. You may reschedule at that time if it is more convenient for you. If you are not at home when our installer arrives, we will leave a card. We will try to return to your home later in the day (when possible). However, if we are unable to return, please follow the instructions on the card and call the office to reschedule your installation. Payment for installation work, security deposit (if applicable), and monthly service charges must be paid in advance or at the time of installation. Positive identification may also be required.
Click here to download the installation instructions(PDF).